top of page
7.jpg

THE ROLLER COASTER CHALLENGE

VEUNE ICON

VENUE

INDOOR

GROUP SIZE ICON

GROUP SIZE

10 - 200

DURATION ICON

DURATION

2 - 3hrs

LOCATION ICON

LOCATION

UK WIDE

colour explosion website.jpg

THE TEAM ENGINEERING AND CONSTRUCTION ACTIVITY

Get ready for The Roller Coaster Challenge – an exciting engineering and construction-based team-building experience where creativity, communication, and problem-solving take centre stage!

Can Your Team Build the Ultimate Thrill Ride?

In this high-energy challenge, teams must design, build, and test a working roller coaster track.

One that will successfully carry a "train" from start to finish without human interference.

With loops, twists, and daring drops, can your team pull off the most elaborate and thrilling ride?

How the Roller Coaster Team Challenge Works

The activity is split into a number of sections and the overall group works on different sections of the construction. 

Planning Phase - Each team must come up with how best they'll build their section of the overall track using the materials provided. 

Design Phase - Teams must each have a unique element in their section, whether that be banked corners, sharp drops or even a loop the loop! 

Construction Phase – Once designs and plans have been signed-off by health and safety, each small team will have a designated building area, plus materials they can use to bring their designs to life. They must work together to design a fully functioning roller coaster section.
Collaborate Across Teams – Top notch communication and planning are essential for the construction phase. Each group must ensure their section connects seamlessly with the others while complying with communication and restrictive build rules. .
Testing Phase – Test, tweak, and perfect your structure before the opening day. This is the first time teams will start to see the success or failures of their work and strive to fix anomalies and inconsistencies against the clock. 
Grand Opening Day! – Everyone gathers around for the grand finale. The final "train" is launched as spectators watch-on in anticipation. Will it make it all the way through? OR will your team need to make final amendments to guide the train safely home? 

​

The goal? A perfectly connected ride that sends your train flying through the track with speed and precision and gives rides the thrill they're looking for. 

The health and safety manager assess the roller coaster team building set up area
Teams constructing a fun roller coaster as part of a team building event

What’s Included?

  • All equipment for the design, build, and construction phases of the team building activity

  • Professional host to introduce and guide the event

  • Health & Safety Manager to oversee builds and judge the final results

  • Sound system & AV setup - We bring high energy music, professional PA system to introduce and manage the activity and professional lighting to transform the space.

  • Plenty of fun, creativity, and team laughs! While this challenge has a real purpose of outlining the importance of communication in the success of a team, it's packed full of laughs and excitement along the way. 

colour explosion website.jpg

Key Benefits of a Build A Structure Team Building Challenge

  • Encourages collaboration – Teams must communicate effectively to ensure success.

  • Develops problem-solving skills – Think fast, adapt, and find creative solutions. One small change at any stage can massively affect the outcome of the overall project.

  • Builds leadership & delegation skills – Assign roles, manage time, and execute a shared vision.

  • Brings out creativity & innovation – There’s no set blueprint—teams must think big!

  • Creates a fun, high-energy atmosphere – A thrilling mix of competition and teamwork.

People laughing and having fun on the roller coaster team building corporate event

Who is This Team Construction Challenge For?

This construction-based team-building event is perfect for:

  • Corporate Team Building Days – A mix of strategy, hands-on creativity, and teamwork.

  • Engineering & STEM-Focused Events – A challenge that incorporates real-world problem-solving.

  • Company Away Days & Conferences – Get teams thinking, building, and working together.

  • We run engineering team-building activities in Manchester, Leeds, Liverpool, and across the UK.

Enginerring team building event with people building a structure
A team working together to build a rollercoaster for a corporate away day

Book The Roller Coaster Challenge Today!

Ready to put your team's engineering and construction skills to the test?

 

Whether you're looking for team construction activities, roller coaster building team challenges, or engaging corporate events, this experience is a must-try!

bottom of page